The first phase of Cairo Metro’s fourth line covers more than 19 kilometers and comprises 16 stations.
The opening of the new bridges comes in line with the company’s master plan to provide all services and vital utility services to Mostakbal City’s residents, Managing Director, and CEO of El-Mostakbal for Urban Development, Ayman El-Kousey, says.
The closure of the tunnel comes after the completion of the water-impounding works by a joint venture between Arab Contractors and Elsewedy Electric.
Hassan El-Far, Chairman of DHCU, says that the contract includes three stages, the first of which comprises management, operation, and maintenance of the project’s first phase, which has the capacity to treat 1.5 mn cubic meters of wastewater daily.
These facilities, collectively, are set to produce up to 7.6 mn tons of green ammonia and 2.7 mn tons of hydrogen a year when fully operated.
Ismail explores the plan of the water and sewerage sector for the rationalization of water consumption, which includes the use of existing drinking water resources; the safe reuse of treated sewerage water; and the minimization of waste.
The first phase of the Center’s pre-opening comes on the sidelines of the Climate Change Conference (COP27).
Saudi Egyptian Developers uncovers the axes of its sustainable development plan in the real estate market, in conjunction with the launch of the United Nations Climate Summit (COP 27).
The logistics hub will be situated over 470,000 sqm. It is intended to be the first sustainable and integrated industrial city in the heart of Egypt’s internal and external trade center.
Page 9 of 43
Get all latest content delivered to your email a few times a month.
Welcome! Login in to your account
Don't have account. Register
Back to Login